When does the DQ3 Purification pack need to be replaced and what are the instructions to replace it?

Dokument-ID

Dokument-ID TE5229

Veröffentlichungsdatum

Veröffentlichungsdatum 19.03.2019
Frage
When does the DQ3 Purification pack need to be replaced and what are the instructions to replace it?
Zusammenfassung
Instructions for Purification pack replacment on Millipore® Direct-Q® 3 Ultrapure Water System.
Antwort
Attached are the instructions for replacement of the DQ3 Purification Pack (Product # 2512201). Here are the main reasons to replace the purification pack:
  1. When the Pack Alarm Icon is blinking.
  2. When the system resistivity display is blinking. The Product resistivity is below the Resistivity Setpoint set in menu option C02.The system may have been in STANDBY mode for a while. Start a manual recirculation to recirculate the water in the system. If the Pack Alarm icon is still displayed, then replace the pack
  3. After a system or tank sanitization.
Photos of the above mentioned display icons are included in the attachment.
Anhänge

Hat dir diese Antwort geholfen?

Wird gesendet...
Vielen Dank für Ihr Feedback.
Beim Senden ist ein Fehler aufgetreten. Versuchen Sie es erneut.